Home / Resources / Audit Readiness

What a validation package needs before go live

A validation package assembled after go live, under deadline pressure, tends to have gaps a package built as the work happened does not. This page covers the components that should exist before a system reaches production, not after.

The core components

A validation plan setting scope and approach, requirements with clear acceptance criteria, test evidence linked to each requirement, a summary report tying it together, and sign offs from the people with actual authority to approve the release. Missing any one of these is usually enough to draw an inspector's attention.

The trap of racing to file everything at the end

When a package gets assembled in the final days before a release, under pressure to hit a date, quality suffers in predictable ways, evidence gets summarized instead of attached, requirements get written to match whatever was actually built rather than the other way around. None of this is intentional dishonesty, it is just what happens under a deadline.

What a better cadence looks like

Evidence collected as work happens, reviewed in smaller batches throughout a release cycle rather than all at once at the end, produces a stronger package with less last minute effort. The goal by go live day is compiling evidence that already exists, not generating it from scratch.

See what a validation package looks like when it builds itself

A short walkthrough of how GxPForge keeps traceability current as your team works, instead of reconstructing it before a release.

Book a demo